COMPANY
GLOBAL ELECTRIC VEHICLE COMPANY

Infrastructure

Electric vehicle production equipment

  • Production plant: 49,586㎡ (building 19,834㎡) production base
  • Annual production: 5000 units
  • Main equipment: design equipment, loading box assembly process equipment, chassis assembly equipment, body assembly equipment, vehicle inspection equipment, side slip and braking test equipment

Manufcturing Process

Design

Chassis Assemble

Body Assembly

Cargo Box Assembly

Inspection for Vehicle Bottom

Side Slip / Braking Test

Battery production equipment

  • Annual production of multi-battery packs: 10,000
  • Main products: secondary battery (Battery Pack)
    1. ESS
    2. Li-Battery Pack (Samsung SDI / LG Chemical Cell)”
  • Main equipment: battery production line process platform, battery cell sorting equipment, battery welding machine

Manufcturing Battery Pack

Battery Production

Battery Welding

Battery Cell Screening

Cell assembly line1

Cell assembly line2

Cell assembly line3

Cell assembly line4